Wall Construction: Form Removal and Clean-up

The last of the wall panels were poured today and crews began the clean-up of the site in preparation for the arrival of the crane on Wednesday. Preparations include stripping all the wall forms, cleaning the footers, exposing support connections for the hooks and tie downs, and removing all debris from the slab and surrounding areas.


Wide angle of the job site from the front.


Clark Fivek checks out the view from his future office.


Now that’s a crowbar. Worker removes nail holding wall forms down to the slab.


Workers remove a wall form.


This is a future window in the front facade.


Here you can see the recess detail on the side of a panel.


Another form is removed.


The top arch of the rear entry panel.
See the previous post for the same angle prior to the pour.


Britt McTammany pretends to be doing something constructive.

Share and Enjoy:
  • Digg
  • Twitter
  • Sphinn
  • del.icio.us
  • Mixx
  • Reddit
  • StumbleUpon
  • Technorati
  • FriendFeed
  • Faves
  • Ping.fm
  • LinkedIn
  • Facebook
  • email

Leave a Reply