Progress continues with a finished roof in terms of structure. The post-production wing’s roof is dried in with the remainder of the roof to be dried in by the end of the week.

The biggest news is the screening room has been excavated and formed with phase one pour on the center slab scheduled for Friday. Other work in progress includes ventilation installation and rough outs on the plumbing and electrical.


Gary and Sonny oversee the Bentonite water proof barrier installation in the screening room.


Ventilation installation is under way in the post-production wing.


Air handlers are on site and being preped by the electrcial sub.


Roofers are hard at work drying the roof in.


Rough plumbing is finished.


Workers lay the Bentonite waterproofing underlayment in the screening room.


The finished screening room viewed from the front door.


HVAC subs install the ventilation duct work.


The roof of the common and production areas is now finished.


Sonny and Gary discuss logistics.

Share and Enjoy:
  • Digg
  • Twitter
  • Sphinn
  • del.icio.us
  • Mixx
  • Reddit
  • StumbleUpon
  • Technorati
  • FriendFeed
  • Faves
  • Ping.fm
  • LinkedIn
  • Facebook
  • email

Leave a Reply