Interior walls and HVAC ventilation
Interior walls have started framing and HVAC ventilation continues. With luck and clear weather the roof should be completely dried in tomorrow.

Walls go up in the studio and surrounding areas in the production wing.

Framer screws steel studs together.

The production wind viewed from the post-production wing.

