Interior framing, rough-in plumbing, HVAC, rough electrical
Work continues on the interior framing, HVAC ventilation, plumbling and electrical rough-ins. The floor in the screening room was also poured today with the steops to go in tomorrow. The roof is still not fully dried in but will hopefully be completed by the end of this week.

Walls in post-production begin to take shape.

Framers us specialized lifts to reach high places.

This is a few of the post-production wing with screening room visible to the left.