Parking lot, exterior priming and HVAC

Work continues at a steady pace with the limerock for the parking lot going in as well as primer on the exterior walls. Interior sheetrock is due to start as soon as the windows and doors get installed sometime the middle of next week.


The machine core in the post-production wing.


Painting the primer.


Ceiling mounted air handlers in the reception area.


One of the audio suites.


One of the large edit suites.


The cafe.


The studio.


The parking lot gets limerock.


Curbs and limerock in the parking lot.


More parking lot.


We have a transformer now!


Every pipe must get insulation.