Sheetrock, Parking Lot, Electrical, Exterior Priming and the minor details
Work continues at a blistering pace as walls are now going up and the interior of the facility really begins to take shape.

Sheetrock is being installed quick time!

The exterior has been primed and is undergoing detailed patching.

Electrical connections are being made.

Backing and bracing along with other “behind the wall” details are being installed.

This is the hall between the graphics and sound design suites.

The view from inside the core… walls are closing in.

Surveyors determine grade levels for the parking lot.