All interior walls, including this one in the conference room, will be well insulated.


The sound stage’s ceiling structure now has a fresh coat of black paint.


The roof structures and HVAC duct work is now flat black in the cafe too.


Two layers of 5/8-inch sheetrock now cover the interior walls of the screening room.


Insulation installation is almost complete throughout the entire facility.


The machine core is getting closer to being completely enclosed.


The audio suite too is almost finished with sheetrock.


The second layer of limestone awaits compaction.


The hallway past operations in the post-production wing.


The framework for the front and rear facades is now installed.