Ceiling grid and electrical fixtures are installed in the audio suites.

The grid in one of the two gallery halls.

ADA safety pavers have been installed in the parking lot.

The ceiling grid and exit signs in one of the front halls.

The core with it’s new ceiling grid and light fixtures.
Posted in Uncategorized by Britt McTammany : November 29, 2007 - 5:20pm | No Comments »

Paint cut in for the ceiling grid in the production area.

The doors onto the rear deck overlooking the wildlife preserve.

Ceiling grid installation has begun.

Curbs are now in surrounding the parking lot.
Posted in Uncategorized by Britt McTammany : November 27, 2007 - 5:16pm | No Comments »

Hand compacting the asphalt.

Crews distribute asphalt on the limerock.

Kickin more asphalt.
Posted in Uncategorized by Britt McTammany : November 20, 2007 - 4:35pm | No Comments »

The front door thresholds being installed.

The rear interior facade.

The machine core.

The rear facade overlooking the pond.

The front facade.

The cafe and bistro kitchen.

The ramp to the parking lot entry.
Posted in Uncategorized by Britt McTammany : November 15, 2007 - 4:29pm | No Comments »

Window glazing started this week.

Exterior paint is nearly finished.

The west facade is completely painted.

Painters do their thing!

The interior is completely rocked!
Posted in Uncategorized by Britt McTammany : November 9, 2007 - 1:59pm | No Comments »

Sheetrock in the bistro kitchen.

The studio now has sheetrock too.

The texture coat was applied this weekend. These are not the final colors.

The cool windows in the hall in the post-production wing.

Bobbi’s office is sheetrocked.

The parking lot is getting closer to completion.

The machine core is almost completely sheetrocked.
Posted in Uncategorized by Britt McTammany : November 5, 2007 - 4:33pm | No Comments »