DIGITAL VIDEO ARTS BLOG - NEWS AND EVENTS

Sheetrock & door and window installation.


The front door thresholds being installed.


The rear interior facade.


The machine core.


The rear facade overlooking the pond.


The front facade.


The cafe and bistro kitchen.


The ramp to the parking lot entry.

Share and Enjoy:
  • Digg
  • Twitter
  • Sphinn
  • del.icio.us
  • Mixx
  • Reddit
  • StumbleUpon
  • Technorati
  • FriendFeed
  • Faves
  • Ping.fm
  • LinkedIn
  • Facebook
  • email

Leave a Reply