
Ceiling grid and electrical fixtures are installed in the audio suites.

The grid in one of the two gallery halls.

ADA safety pavers have been installed in the parking lot.

The ceiling grid and exit signs in one of the front halls.

The core with it’s new ceiling grid and light fixtures.
Posted in Uncategorized by Britt McTammany : November 29, 2007 - 5:20pm | No Comments »