Plumbing fixtures and downspouts


The new plumbing fixtures in the restrooms.


The water downspouts on the exterior have been installed.

Electrical, Paint, Ceiling, etc…


The cafe as seen from the post-production wing.


The reception area and bathrooms.


One of our showcase gallery walls.


The copy room.


The make-up areas.


The prep kitchen complete with a new sink.


The cafe as viewed from the production wing.


The halls to graphics and audio looking toward the cafe.


The audio suites now have millwork.


The art nook in the graphics/audio wing.

3D Screening Room

Here’s another angle of the screening room animation.

Millwork, parking lot, stucco, and other finishing touches.


Decorative accents for the facade are preped and ready for installation.


Stucco on the exterior overhangs.


Cabinetry in the copy room has been installed.


Countertop installations in the edit suites are being installed.


The parking lot now has lines!


Cool light fixtures being installed in the reception area.


Millwork in graphics is being installed.

3D Visualization of 24-seat screening room.

This is a 3D visualization and animation of the new screening room built to determine color selections for wall sound treatments.

Painting and millwork installation.


The new back deck construction has been completed.


Paint in one of the edit suites.


The screening room has new sconces and black walls.


Painting continues throught the facility.


Cool colors in the audio suites.


The sound stage is now black!


The prep kitchen’s base cabinets are in place.


Cabinetry in the prep kitchen and copy room starts installation today.


Painting of door jams in the machine core.

The hall to graphics and audio design.