DIGITAL VIDEO ARTS BLOG - NEWS AND EVENTS

Millwork, parking lot, stucco, and other finishing touches.


Decorative accents for the facade are preped and ready for installation.


Stucco on the exterior overhangs.


Cabinetry in the copy room has been installed.


Countertop installations in the edit suites are being installed.


The parking lot now has lines!


Cool light fixtures being installed in the reception area.


Millwork in graphics is being installed.

Share and Enjoy:
  • Digg
  • Twitter
  • Sphinn
  • del.icio.us
  • Mixx
  • Reddit
  • StumbleUpon
  • Technorati
  • FriendFeed
  • Faves
  • Ping.fm
  • LinkedIn
  • Facebook
  • email

Leave a Reply