The front facade and ladscape.

The rear facade.
Posted in Uncategorized by Britt McTammany : January 25, 2008 - 7:56am | No Comments »

The galleries have finished wood floors.

The signage on the front is now finished.

Clean up started today with many rooms ready for move-in.

Graphics is clean and ready to go.

The on-line suites are clean too.

A cleaner work on windows.

The wood flooring is finished with the exception of the trim.
Posted in Uncategorized by Britt McTammany : January 23, 2008 - 4:12pm | No Comments »

A panoramic shot of the cafe and bistro.
Posted in Uncategorized by Britt McTammany : January 22, 2008 - 4:00pm | No Comments »
The warmth of wood flooring in the cafe and bistro overlooking the nature preserve.
The bistro bar with new wood flooring.
The wood floors in the cafe.
The wood floors in the hallway from the production department.
The soundstage’s ceiling is now insulated for sound.
Plants for the landscaping have started to arrive.
Posted in Uncategorized by Britt McTammany : January 21, 2008 - 2:39pm | No Comments »

The data and phone wiring has been installed and dressed down.

The IP phone wiring grid.

The floors in the cafe are being cleaned and preped for wood flooring.

The floors are floated with quick set for perfect levelness.

Workers float quickset in the cafe.
Posted in Uncategorized by Britt McTammany : January 17, 2008 - 5:35pm | No Comments »

The ornamental iron fence is now installed.

Carpet in the restroom vestibule is finished.

We have appliances.

The bistro kitchen still awaits finall wiring and installation.

One of the sudio suites awaits final millwork installations.

Graphics is almost finished… just waiting for a door.

The data closet now has a floor and a rack.
Posted in Uncategorized by Britt McTammany : January 15, 2008 - 6:58pm | No Comments »

Carpet in the screening room is nearing competion.

Ornamental fencing has been installed.

Carpet in the production area is finished.

The data rack has been installed.
Posted in Uncategorized by Britt McTammany : January 15, 2008 - 5:43pm | No Comments »

Carpet in one of the sound design suites.

The fine art of cutting carpet.

The new bistro bar and island installation… including Clark and Bill.

The exterior signage in mid-installation.

Another piece of the logo being installed.

Carpet tiles being installed in one of the halls.

Applying glue and fitting a carpet tile.

Glue awaits tiles.

The finished sign with lettering.
Posted in Uncategorized by Britt McTammany : January 10, 2008 - 12:00pm | No Comments »

ARchitectural details on the front facade.

Carpet in the machine core.

Carpet in one of the edit suites.

Water fountains.
Posted in Uncategorized by Britt McTammany : January 8, 2008 - 3:11pm | No Comments »

Carpet rolls and tiles are staged and ready for installation.

The last decorative elements of the front facade started installation.

Carpet being installed in the graphics/interactive design suites.

The floor in the machine core is ready for carpet.

The shower fixture in the dressing rooms.

Shelves in the prep kitchen.
Posted in Uncategorized by Britt McTammany : January 7, 2008 - 4:46pm | No Comments »